Schoenherr has successfully represented ImWind in obtaining a legally binding EIA permit for the Loidesthal II wind farm in Zistersdorf, Lower Austria.
According to the firm, "this means that the construction of 11 wind turbines with a total capacity of around 73 megawatts can now begin. Operation is planned for the end of 2025."
ImWind, an Austrian renewable energy producer, is responsible for the construction of the wind farm that will supply more than 43,000 households with green electricity every year.
The Schoenherr team included Partner Christian Schmelz and Attorneys at Law Christoph Jirak, Benjamin Schlatter, and Sarah Wolf.