DWF Advises Tele-Fonika Kable on Cable Supply and Installation Contract with Baltic Power

DWF Advises Tele-Fonika Kable on Cable Supply and Installation Contract with Baltic Power

Poland
Tools
Typography
  • Smaller Small Medium Big Bigger
  • Default Helvetica Segoe Georgia Times

DWF has advised NKT consortium's Tele-Fonika Kable and DEME on a reservation contract for the design, supply, and installation of the inter-array, offshore, and onshore export cables for the Baltic Power offshore wind farm. Reportedly, Hogan Lovells’ German office advised Baltic Power.

The Baltic Power offshore wind farm, with a capacity of up to 1.2 gigawatts, is located in the Polish section of the Baltic Sea. Once it achieves its expected commercial operations in 2026, it will be able to supply more than 1.5 million households with clean energy. The Baltic Power wind farm is a joint project between the Orlen Group and Northland Power.